
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
1718140008
| Molex |
CONN HEADER R/A 8POS 3.96MM
| MPQ: 600 Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
TT240N36KOFHPSA1
| Infineon |
SCR MODULE 3.6KV 700A MODULE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
TZ630N24KOFHPSA1
| Infineon |
SCR MODULE 2.4KV 1500A MODULE
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6400 | Total:
$
| |
HNC1-2.5P-12DS(55)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT 12POS 2.5MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
T280N65TOFXPSA1
| Infineon |
SCR MODULE 6500V 440A DO200AB
| MPQ: 6 Lead Time: 9-12Days | -- -- | 3400 | Total:
$
| |
TZ740N22KOFB1HPSA2
| Infineon |
SCR MODULE 2200V 1500A MODULE
| MPQ: 1 Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
DF22L-1P-7.92DSA(25)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT 1POS
| MPQ: 150 Lead Time: 9-12Days | -- -- | 3200 | Total:
$
| |
DF22-1P-7.92DSA(25)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT 1POS
| MPQ: 150 Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
DF1-13P-2.5DS(05)
| Hirose Electric Co.,Ltd. |
CONN HEADER R/A 13POS 2.5MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
T3710N06TOFVTXPSA1
| Infineon |
SCR MODULE 600V 7000A DO200AD
| MPQ: 2 Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
T2180N12TOFVTXPSA1
| Infineon |
SCR MODULE 1800V 4460A DO200AD
| MPQ: 2 Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
TT240N38KOFHPSA1
| Infineon |
SCR MODULE 3.8KV 700A MODULE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 4000 | Total:
$
| |
T2180N14TOFVTXPSA1
| Infineon |
SCR MODULE 1800V 4460A DO200AD
| MPQ: 2 Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
T2180N16TOFVTXPSA1
| Infineon |
SCR MODULE 1800V 4460A DO200AD
| MPQ: 2 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
0009652039
| Molex |
CONN HEADER VERT 3POS 3.96MM
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
T2180N18TOFVTXPSA1
| Infineon |
SCR MODULE 1800V 4460A DO200AD
| MPQ: 2 Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
1-640384-3
| Te Connectivity |
CONN HEADER VERT 13POS 3.96MM
| MPQ: 500 Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
T1590N26TOFVTXPSA1
| Infineon |
SCR MODULE 2800V 3200A DO200AD
| MPQ: 2 Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
DF1BD-4P-2.5DSA(05)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT 4POS 2.5MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
1-292206-5
| Te Connectivity |
CONN HEADER R/A 15POS 1.5MM
| MPQ: 2400 Lead Time: 9-12Days | -- -- | 8700 | Total:
$
|