
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
ETD630N16P60HPSA1
| Infineon |
SCR MODULE 1.6KV 700A MODULE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
G88MP14102CEU
| Amphenol |
CONN HEADER VERT 14POS 3MM
| MPQ: 240 Lead Time: 9-12Days | -- -- | 400 | Total:
$
| |
ETT580N16P60HPSA1
| Infineon |
SCR MODULE 1.6KV 700A MODULE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
0026603129
| Molex |
CONN HEADER R/A 12POS 3.96MM
| MPQ: 150 Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
860-10-008-10-001101
| Preci-Dip |
CONN HEADER VERT 8POS 1MM
| MPQ: 500 Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
0022285252
| Molex |
CONN HEADER VERT 25POS 2.54MM
| MPQ: 375 Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
TT150N26KOFHPSA1
| Infineon |
SCR MODULE 2.6KV 350A MODULE
| MPQ: 3 Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
TZ240N34KOFHPSA1
| Infineon |
SCR MODULE 3.4KV 700A MODULE
| MPQ: 3 Lead Time: 9-12Days | -- -- | 8600 | Total:
$
| |
0022285251
| Molex |
CONN HEADER VERT 25POS 2.54MM
| MPQ: 375 Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
TZ240N36KOFHPSA1
| Infineon |
SCR MODULE 3.6KV 700A MODULE
| MPQ: 3 Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
0022285250
| Molex |
CONN HEADER VERT 25POS 2.54MM
| MPQ: 375 Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
TD500N12KOFHPSA2
| Infineon |
SCR MODULE 1800V 900A MODULE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 8400 | Total:
$
| |
TT425N12KOFHPSA2
| Infineon |
SCR MODULE 1.2KV 800A MODULE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 7600 | Total:
$
| |
10137924-0412LF
| Amphenol |
CONN PWR3.0 R/A SMT
| MPQ: 200 Lead Time: 9-12Days | -- -- | 8000 | Total:
$
| |
TD425N16KOFHPSA2
| Infineon |
SCR MODULE 1800V 800A MODULE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
TT425N14KOFHPSA2
| Infineon |
SCR MODULE 1.4KV 800A MODULE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 9800 | Total:
$
| |
TT500N12KOFHPSA2
| Infineon |
SCR MODULE 1.2KV 900A MODULE
| MPQ: 2 Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
1510134506
| Molex |
2MM VT HDR CONN .05AULF 6CKT
| MPQ: 1600 Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
1510134006
| Molex |
2MM VT HDR CONN .05AULF 6CKT
| MPQ: 1600 Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
0423753548
| Molex |
CONN HEADER VERT 16POS 2.54MM
| MPQ: 750 Lead Time: 9-12Days | -- -- | 4700 | Total:
$
|