Analog Devices
Profile:
Analog Devices is a leading supplier of data conversion and signal processing technologies in the world. The company is committed to providing the high-performance products and solutions in the fields of communications infrastructure, industrial automation, industrial instrumentation, automotive electronics, and healthcare.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
KBP408G
Diodes Incorporated
BRIDGE RECT 1PHASE 800V 4A KBP

MPQ: 35

Lead Time: 9-12Days

-- --
4500
Total: $
TMM-105-01-F-S-SM-TR
Samtec
2MM TERMINAL STRIP

MPQ: 750

Lead Time: 9-12Days

-- --
8400
Total: $
KBP410G
Diodes Incorporated
BRIDGE RECT 1PHASE 1KV 4A KBP

MPQ: 35

Lead Time: 9-12Days

-- --
8700
Total: $
GBL410_HF
Diodes Incorporated
BRIDGE RECT 1PHASE 1KV 4A GBL

MPQ: 25

Lead Time: 9-12Days

-- --
5200
Total: $
DF15005S
Diodes Incorporated
BRIDGE RECT 1PHASE 50V 1.5A DF-S

MPQ: 50

Lead Time: 9-12Days

-- --
700
Total: $
DF1502S
Diodes Incorporated
BRIDGE RECT 1P 200V 1.5A DF-S

MPQ: 50

Lead Time: 9-12Days

-- --
1800
Total: $
DF1501S
Diodes Incorporated
BRIDGE RECT 1P 100V 1.5A DF-S

MPQ: 50

Lead Time: 9-12Days

-- --
2800
Total: $
TMM-102-06-SM-S-SM
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
1400
Total: $
IR2153C
Infineon
IC GATE DRVR

MPQ: 1

Lead Time: 9-12Days

-- --
1300
Total: $
MCP14A1201T-E/SNVAO
Microchip
IC GATE DRVR LOW-SIDE 8SOIC

MPQ: 3300

Lead Time: 9-12Days

-- --
800
Total: $
MCP14A1202T-E/SNVAO
Microchip
IC GATE DRVR LOW-SIDE 8SOIC

MPQ: 3300

Lead Time: 9-12Days

-- --
5600
Total: $
MCP14A1202T-E/MNYVAO
Microchip
IC GATE DRVR LOW-SIDE 8TDFN

MPQ: 3300

Lead Time: 9-12Days

-- --
2100
Total: $
MCP14A1201T-E/MNYVAO
Microchip
IC GATE DRVR LOW-SIDE 8TDFN

MPQ: 3300

Lead Time: 9-12Days

-- --
6100
Total: $
TMM-104-06-L-S
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
8700
Total: $
MAX5048AAUT+TW
Analog Devices
IC GATE DRVR LOW-SIDE SOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
800
Total: $
TMM-102-06-S-S-SM
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
4300
Total: $
TMM-102-01-F-S-001
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
7500
Total: $
TSM-103-02-G-SH
Samtec
CONN HEADER SMD R/A 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
3000
Total: $
FTSH-103-01-F
Samtec
CONN HEADER 1.27MM

MPQ: 1

Lead Time: 9-12Days

-- --
1500
Total: $
FTS-102-03-L-SV
Samtec
CONN HEADER SMD 2POS 1.27MM

MPQ: 1

Lead Time: 9-12Days

-- --
2700
Total: $
  • 1
  • 1257
  • 1258
  • 1259
  • 1260
  • 1261
  • 6854
Go to