Onsemi
Profile:
On Semiconductor Corporation (NASDAQ: ON), founded in 1999 and headquartered in Scottsdale, Arizona, USA, is a leading supplier of high-performance silicon solutions for energy-efficient electronic products. The company, with its subsidiaries, is engaged in the business of driving innovation in energy-efficient electronics.ON Semiconductor's product portfolio includes power and signal management, logic, discrete, and custom devices. These products help customers address unique design challenges across various applications such as automotive, communications, computing, consumer electronics, industrial, LED lighting, medical, military/aerospace, and power supplies. The company designs, manufactures, and sells advanced electronic systems and a wide range of semiconductor components to meet the needs of diverse design combinations.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
STK672-442BNGEVB
Onsemi
EVAL BOARD STK672-442BNG

Lead Time: 9-12Days

-- --
7400
Total: $
LB1938FAGEVB
Onsemi
EVAL BOARD H-BRIDGE MOTOR DVR

Lead Time: 9-12Days

-- --
400
Total: $
NCN512110GEVB
Onsemi
EVAL BOARD NCN512110

Lead Time: 9-12Days

-- --
8200
Total: $
NCN513010GEVB
Onsemi
EVAL BOARD NCN513010

Lead Time: 9-12Days

-- --
9200
Total: $
NV706272R1DBGEVB
Onsemi
EVAL BOARD FOR NCV70627

MPQ: 1

Lead Time: 9-12Days

-- --
5400
Total: $
NCP382LMN20AGEVB
Onsemi
EVAL BOARD NCP382LMN20AG

Lead Time: 9-12Days

-- --
5100
Total: $
NCP382LMN15AGEVB
Onsemi
EVAL BOARD NCP382LMN15AG

Lead Time: 9-12Days

-- --
2400
Total: $
NCP382LMN10AGEVB
Onsemi
EVAL BOARD NCP382LMN10AG

Lead Time: 9-12Days

-- --
900
Total: $
NCP382HMN20AGEVB
Onsemi
EVAL BOARD NCP382HMN20AG

Lead Time: 9-12Days

-- --
1900
Total: $
NCP382HMN15AGEVB
Onsemi
EVAL BOARD NCP382HMN15AG

Lead Time: 9-12Days

-- --
6000
Total: $
NCP382HMN10AGEVB
Onsemi
EVAL BOARD NCP382HMN10AG

Lead Time: 9-12Days

-- --
3100
Total: $
NCP382HD10AAGEVB
Onsemi
BOARD EVAL LOAD SWITCH NCP382

MPQ: 1

Lead Time: 9-12Days

-- --
4900
Total: $
NCP382HD15AAGEVB
Onsemi
BOARD EVAL LOAD SWITCH NCP382

MPQ: 1

Lead Time: 9-12Days

-- --
3600
Total: $
NCP382LD10AAGEVB
Onsemi
BOARD EVAL LOAD SWITCH NCP382

Lead Time: 9-12Days

-- --
7200
Total: $
NCP382LD15AAGEVB
Onsemi
BOARD EVAL LOAD SWITCH NCP382

MPQ: 1

Lead Time: 9-12Days

-- --
7600
Total: $
NCP380LSN05AGEVB
Onsemi
BOARD EVAL NCP380LSN05 LOAD SW

MPQ: 1

Lead Time: 9-12Days

-- --
6600
Total: $
NCP380LMU15AGEVB
Onsemi
BOARD EVAL NCP380LMU15 LOAD SW

Lead Time: 9-12Days

-- --
7700
Total: $
NCP380HSN05AGEVB
Onsemi
BOARD EVAL NCP380HSN05 LOAD SW

MPQ: 1

Lead Time: 9-12Days

-- --
4100
Total: $
NCP380HMU20AGEVB
Onsemi
BOARD EVAL NCP380HMU20 LOAD SW

MPQ: 1

Lead Time: 9-12Days

-- --
5800
Total: $
NCP380HMU15AGEVB
Onsemi
BOARD EVAL NCP380HMU15 LOAD SW

MPQ: 1

Lead Time: 9-12Days

-- --
1200
Total: $
  • 1
  • 799
  • 800
  • 801
  • 802
  • 803
  • 3248
Go to