Onsemi
Profile:
On Semiconductor Corporation (NASDAQ: ON), founded in 1999 and headquartered in Scottsdale, Arizona, USA, is a leading supplier of high-performance silicon solutions for energy-efficient electronic products. The company, with its subsidiaries, is engaged in the business of driving innovation in energy-efficient electronics.ON Semiconductor's product portfolio includes power and signal management, logic, discrete, and custom devices. These products help customers address unique design challenges across various applications such as automotive, communications, computing, consumer electronics, industrial, LED lighting, medical, military/aerospace, and power supplies. The company designs, manufactures, and sells advanced electronic systems and a wide range of semiconductor components to meet the needs of diverse design combinations.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SMUN5214T1G
Onsemi
TRANS PREBIAS NPN 50V SC70-3

Lead Time: 9-12Days

-- --
2400
Total: $
SMUN2240T1G
Onsemi
TRANS PREBIAS NPN 50V 0.1A SC59

Lead Time: 9-12Days

-- --
1800
Total: $
FGA30T65SHD
Onsemi
IGBT TRENCH FS 650V 60A TO-3PN

Lead Time: 9-12Days

-- --
6800
Total: $
NSVMMUN2230LT1G
Onsemi
TRANS PREBIAS NPN 50V SOT23-3

Lead Time: 9-12Days

-- --
1700
Total: $
MUN2212T1G
Onsemi
TRANS PREBIAS NPN 50V 0.1A SC59

Lead Time: 9-12Days

-- --
1400
Total: $
DTA124EET1G
Onsemi
TRANS PREBIAS PNP 50V 0.1A SC75

Lead Time: 9-12Days

-- --
2500
Total: $
FGB7N60UNDF
Onsemi
IGBT NPT 600V 14A TO-263

Lead Time: 9-12Days

-- --
9100
Total: $
FGH30T65UPDT-F155
Onsemi
IGBT TRENCH FS 650V 60A TO-247-3

Lead Time: 9-12Days

-- --
1900
Total: $
FOD3150SDV
Onsemi
OPTOISO 5KV 1CH GATE DVR 8SMD

Lead Time: 9-12Days

-- --
6800
Total: $
EMI9408MUTAG
Onsemi
FILTER LC(PI) 70NH/11.5PF SMD

Lead Time: 9-12Days

-- --
5900
Total: $
MMUN2216LT1G
Onsemi
TRANS PREBIAS NPN 50V SOT23-3

Lead Time: 9-12Days

-- --
3600
Total: $
SMUN2213T1G
Onsemi
TRANS PREBIAS NPN 50V 0.1A SC59

Lead Time: 9-12Days

-- --
200
Total: $
MMUN2132LT1G
Onsemi
TRANS PREBIAS PNP 50V SOT23-3

Lead Time: 9-12Days

-- --
4800
Total: $
MMUN2240LT1G
Onsemi
TRANS PREBIAS NPN 50V SOT23-3

Lead Time: 9-12Days

-- --
9400
Total: $
MUN5232T1G
Onsemi
TRANS PREBIAS NPN 50V SC70-3

Lead Time: 9-12Days

-- --
2600
Total: $
BC847BPDW1T2G
Onsemi
TRANS NPN/PNP 45V 0.1A SOT363

Lead Time: 9-12Days

-- --
700
Total: $
MUN2215T1G
Onsemi
TRANS PREBIAS NPN 50V 0.1A SC59

Lead Time: 9-12Days

-- --
8500
Total: $
NBXSGA008LNHTAG
Onsemi
IC OSC XTAL 161.1328MHZ 6CLCC

Lead Time: 9-12Days

-- --
4200
Total: $
NBXSBB024LNHTAG
Onsemi
IC OSC XTAL 622.08MHZ 6CLCC

Lead Time: 9-12Days

-- --
6300
Total: $
NBXMBB024LNHTAG
Onsemi
IC OSC XTAL 622.08MHZ 6CLCC

Lead Time: 9-12Days

-- --
6500
Total: $
  • 1
  • 214
  • 215
  • 216
  • 217
  • 218
  • 3248
Go to