Onsemi
Profile:
On Semiconductor Corporation (NASDAQ: ON), founded in 1999 and headquartered in Scottsdale, Arizona, USA, is a leading supplier of high-performance silicon solutions for energy-efficient electronic products. The company, with its subsidiaries, is engaged in the business of driving innovation in energy-efficient electronics.ON Semiconductor's product portfolio includes power and signal management, logic, discrete, and custom devices. These products help customers address unique design challenges across various applications such as automotive, communications, computing, consumer electronics, industrial, LED lighting, medical, military/aerospace, and power supplies. The company designs, manufactures, and sells advanced electronic systems and a wide range of semiconductor components to meet the needs of diverse design combinations.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MOC3012SR2M
Onsemi
OPTOISOLATOR 4.17KV TRIAC 6SMD

Lead Time: 9-12Days

-- --
2000
Total: $
NSBC114TDXV6T1G
Onsemi
TRANS PREBIAS 2NPN 50V SOT563

Lead Time: 9-12Days

-- --
5400
Total: $
MOC3051SM
Onsemi
OPTOISOLATOR 4.17KV TRIAC 6SMD

Lead Time: 9-12Days

-- --
5600
Total: $
MOC3073SM
Onsemi
RAND PHASE TRIAC SM

Lead Time: 9-12Days

-- --
9000
Total: $
MOC3063SVM
Onsemi
OPTOISOLATOR 4.17KV TRIAC 6SMD

Lead Time: 9-12Days

-- --
8900
Total: $
MOC3072SR2VM
Onsemi
6PW RP TRIAC T&R VDE

Lead Time: 9-12Days

-- --
7100
Total: $
NTJD4152PT2G
Onsemi
MOSFET 2P-CH 20V 0.88A SC88

Lead Time: 9-12Days

-- --
9800
Total: $
NST3906DXV6T1G
Onsemi
TRANS 2PNP 40V 200MA SOT-563

Lead Time: 9-12Days

-- --
5200
Total: $
DTC124EM3T5G
Onsemi
TRANS PREBIAS NPN 50V SOT723

Lead Time: 9-12Days

-- --
7900
Total: $
MOC3062TVM
Onsemi
OPTOISOLATOR 4.17KV TRIAC 6DIP

Lead Time: 9-12Days

-- --
4400
Total: $
MOC3043SM
Onsemi
OPTOISOLATOR 4.17KV TRIAC 6SMD

Lead Time: 9-12Days

-- --
1500
Total: $
FDC6303N
Onsemi
MOSFET 2N-CH 25V 0.68A SSOT6

Lead Time: 9-12Days

-- --
4000
Total: $
CPH3910-TL-E
Onsemi
JFET N-CH 25V 50MA 3CPH

Lead Time: 9-12Days

-- --
1200
Total: $
MUN5115DW1T1G
Onsemi
TRANS PREBIAS 2PNP 50V SC88

Lead Time: 9-12Days

-- --
5600
Total: $
MUN5232DW1T1G
Onsemi
TRANS 2NPN PREBIAS 0.25W SOT363

Lead Time: 9-12Days

-- --
8500
Total: $
MUN5336DW1T1G
Onsemi
TRANS NPN/PNP BJT SC70-6

Lead Time: 9-12Days

-- --
7800
Total: $
MUN5230T1G
Onsemi
TRANS PREBIAS NPN 50V SC70-3

Lead Time: 9-12Days

-- --
7500
Total: $
MUN5130DW1T1G
Onsemi
TRANS PREBIAS 2PNP 50V SC88

Lead Time: 9-12Days

-- --
8000
Total: $
FGH40N60SMD-F085
Onsemi
IGBT FIELD STOP 600V 80A TO247

Lead Time: 9-12Days

-- --
1200
Total: $
FGP3440G2-F085
Onsemi
IGBT 400V 26.9A TO-220-3

Lead Time: 9-12Days

-- --
7500
Total: $
  • 1
  • 212
  • 213
  • 214
  • 215
  • 216
  • 3248
Go to