Onsemi
Profile:
On Semiconductor Corporation (NASDAQ: ON), founded in 1999 and headquartered in Scottsdale, Arizona, USA, is a leading supplier of high-performance silicon solutions for energy-efficient electronic products. The company, with its subsidiaries, is engaged in the business of driving innovation in energy-efficient electronics.ON Semiconductor's product portfolio includes power and signal management, logic, discrete, and custom devices. These products help customers address unique design challenges across various applications such as automotive, communications, computing, consumer electronics, industrial, LED lighting, medical, military/aerospace, and power supplies. The company designs, manufactures, and sells advanced electronic systems and a wide range of semiconductor components to meet the needs of diverse design combinations.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
AFGHL75T65SQD
Onsemi
IGBT TRENCH FS 650V 80A TO-247-3

MPQ: 30

Lead Time: 9-12Days

-- --
9200
Total: $
FGH75T65SHDTL4
Onsemi
IGBT FIELD STOP 650V 150A TO247

MPQ: 30

Lead Time: 9-12Days

-- --
3800
Total: $
ISL9V3040D3STV
Onsemi
IGBT 400V 21A DPAK

MPQ: 2500

Lead Time: 9-12Days

-- --
6300
Total: $
FGD3325G2-F085V
Onsemi
IGBT 250V 41A TO-252AA

MPQ: 2500

Lead Time: 9-12Days

-- --
7100
Total: $
FGD3040G2-F085V
Onsemi
IGBT 400V 41A TO-252

MPQ: 2500

Lead Time: 9-12Days

-- --
8300
Total: $
TIG064E8-TL-H
Onsemi
IGBT 400V ECH8

Lead Time: 9-12Days

-- --
2600
Total: $
FGD3440G2-F085V
Onsemi
IGBT 400V 26.9A DPAK

Lead Time: 9-12Days

-- --
2900
Total: $
FGD3245G2-F085C
Onsemi
IGBT 450V 23A TO-252

MPQ: 2500

Lead Time: 9-12Days

-- --
600
Total: $
FGD3050G2V
Onsemi
IGBT 500V 27A DPAK-3

MPQ: 2500

Lead Time: 9-12Days

-- --
9600
Total: $
FGD3245G2-F085V
Onsemi
IGBT 450V 23A DPAK

MPQ: 2500

Lead Time: 9-12Days

-- --
1100
Total: $
FGD1240G2
Onsemi
IGBT 600V DPAK-3

MPQ: 2500

Lead Time: 9-12Days

-- --
100
Total: $
FGD3050G2
Onsemi
IGBT 500V 32A TO-252

MPQ: 2500

Lead Time: 9-12Days

-- --
9100
Total: $
FGB5N60UNDF
Onsemi
IGBT NPT 600V 10A TO-263

Lead Time: 9-12Days

-- --
900
Total: $
FGPF4565
Onsemi
IGBT TRENCH FS 650V TO-220F-3

Lead Time: 9-12Days

-- --
6300
Total: $
ISL9V2040S3ST
Onsemi
IGBT 430V 10A TO-263

Lead Time: 9-12Days

-- --
3800
Total: $
SGP23N60UFDTU
Onsemi
IGBT 600V 23A TO-220-3

Lead Time: 9-12Days

-- --
6000
Total: $
ISL9V2540S3ST
Onsemi
IGBT 430V 15.5A TO-263

Lead Time: 9-12Days

-- --
7300
Total: $
SGS23N60UFDTU
Onsemi
IGBT 600V 23A TO-220F-3

Lead Time: 9-12Days

-- --
9500
Total: $
HGTP5N120BND
Onsemi
IGBT NPT 1200V 21A TO-220-3

Lead Time: 9-12Days

-- --
900
Total: $
FGB3040G2-F085C
Onsemi
IGBT 400V 41A TO-263

MPQ: 800

Lead Time: 9-12Days

-- --
3700
Total: $
  • 1
  • 154
  • 155
  • 156
  • 157
  • 158
  • 3248
Go to