Onsemi
Profile:
On Semiconductor Corporation (NASDAQ: ON), founded in 1999 and headquartered in Scottsdale, Arizona, USA, is a leading supplier of high-performance silicon solutions for energy-efficient electronic products. The company, with its subsidiaries, is engaged in the business of driving innovation in energy-efficient electronics.ON Semiconductor's product portfolio includes power and signal management, logic, discrete, and custom devices. These products help customers address unique design challenges across various applications such as automotive, communications, computing, consumer electronics, industrial, LED lighting, medical, military/aerospace, and power supplies. The company designs, manufactures, and sells advanced electronic systems and a wide range of semiconductor components to meet the needs of diverse design combinations.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
HGTD7N60C3S9A
Onsemi
IGBT 600V 14A TO-252AA

Lead Time: 9-12Days

-- --
600
Total: $
HGT1S10N120BNST
Onsemi
IGBT NPT 1200V 35A TO-263

Lead Time: 9-12Days

-- --
8400
Total: $
FGB20N60SFD-F085
Onsemi
IGBT FIELD STOP 600V 40A TO-263

MPQ: 800

Lead Time: 9-12Days

-- --
600
Total: $
ISL9V5045S3ST
Onsemi
IGBT 480V 51A TO-263

Lead Time: 9-12Days

-- --
4700
Total: $
ISL9V5045S3ST-F085
Onsemi
IGBT 480V 51A TO-263

MPQ: 800

Lead Time: 9-12Days

-- --
5600
Total: $
FGB40N60SM
Onsemi
IGBT FIELD STOP 600V 80A TO-263

Lead Time: 9-12Days

-- --
4600
Total: $
NGTB45N60S2WG
Onsemi
IGBT 45A 600V TO-247

Lead Time: 9-12Days

-- --
9600
Total: $
NGTB05N60R2DT4G
Onsemi
IGBT 5A 600V DPAK

Lead Time: 9-12Days

-- --
4800
Total: $
NGTG15N60S1EG
Onsemi
IGBT NPT 600V 30A TO-220AB

Lead Time: 9-12Days

-- --
200
Total: $
FGP3040G2-F085
Onsemi
IGBT 400V 41A TO-220-3

Lead Time: 9-12Days

-- --
9000
Total: $
HGTG12N60A4D
Onsemi
IGBT 600V 54A TO-247-3

Lead Time: 9-12Days

-- --
8400
Total: $
SGS10N60RUFDTU
Onsemi
IGBT 600V 16A TO-220F-3

Lead Time: 9-12Days

-- --
1500
Total: $
SGP23N60UFTU
Onsemi
IGBT 600V 23A TO-220-3

Lead Time: 9-12Days

-- --
6500
Total: $
HGTG5N120BND
Onsemi
IGBT NPT 1200V 21A TO-247-3

MPQ: 30

Lead Time: 9-12Days

-- --
9700
Total: $
FGA15N120ANTDTU-F109
Onsemi
IGBT NPT/TRENCH 1200V 30A TO-3P

Lead Time: 9-12Days

-- --
4900
Total: $
NGTB20N120IHRWG
Onsemi
IGBT TRENCH FS 1200V 40A TO-247

Lead Time: 9-12Days

-- --
5100
Total: $
NGTB40N65IHL2WG
Onsemi
IGBT TRENCH FS 650V 80A TO-247-3

Lead Time: 9-12Days

-- --
9200
Total: $
NGTB40N120IHRWG
Onsemi
IGBT TRENCH FS 1200V 80A TO-247

MPQ: 30

Lead Time: 9-12Days

-- --
1100
Total: $
NGTB40N120FL2WG
Onsemi
IGBT TRENCH FS 1200V 80A TO-247

MPQ: 30

Lead Time: 9-12Days

-- --
7900
Total: $
NGTB40N120FL2WAG
Onsemi
IGBT FS 1200V 160A TO-247-4L

Lead Time: 9-12Days

-- --
2600
Total: $
  • 1
  • 151
  • 152
  • 153
  • 154
  • 155
  • 3248
Go to