Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
---|---|---|---|---|---|---|---|
NTA4153NT1H
| Onsemi |
RF MOSFET 20V SC75
| Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
2SB986T
| Onsemi |
POWER BIPOLAR TRANSISTOR, PNP
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
MC74LVXT8053DT
| Onsemi |
SINGLE-ENDED MUX, 2 CHANNEL
| Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
MV2109
| Onsemi |
DIODE TUNING 30V 200MA TO92
| Lead Time: 9-12Days | -- -- | 9400 | Total:
$
| |
MC74HC138ADT
| Onsemi |
DECODER/DRIVER, HC/UH SERIES
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
MUN5113DW1T1
| Onsemi |
TRANS 2PNP PREBIAS 0.25W SOT363
| Lead Time: 9-12Days | -- -- | 6400 | Total:
$
| |
SC79178GDR2G
| Onsemi |
ANA MOTOR CONTROLLER
| Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
MC74HCT541ADT
| Onsemi |
IC BUFF NON-INVERT 5.5V 20TSSOP
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
2SD1684T
| Onsemi |
POWER BIPOLAR TRANSISTOR NPN
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
STK433-270-E
| Onsemi |
60W X 3-CH CLASS AB AUDIO POWER
| Lead Time: 9-12Days | -- -- | 3200 | Total:
$
| |
P6KE120ARLG
| Onsemi |
TRANS VOLTAGE SUPPRESSOR DIODE
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
NTD4865NT4H
| Onsemi |
RF MOSFET 25V DPAK
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
2SK3819-DL-E
| Onsemi |
NCH 4V DRIVE SERIES
| Lead Time: 9-12Days | -- -- | 3400 | Total:
$
| |
STK621-623A-E
| Onsemi |
3PHASE INVERTER HIC
| Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
MTY30N50E
| Onsemi |
N-CHANNEL POWER MOSFET
| Lead Time: 9-12Days | -- -- | 7400 | Total:
$
| |
2SK4120LS
| Onsemi |
N-CHANNEL POWER MOSFET
| Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
MC74HCT138ADT
| Onsemi |
DECODER/DRIVER, HCT SERIES
| Lead Time: 9-12Days | -- -- | 4000 | Total:
$
| |
MC74LVX32D
| Onsemi |
IC GATE OR
| Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
NCP1232DR2
| Onsemi |
IC SUPERVISOR PWR SUP MGMT CIRC
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
SC78170P
| Onsemi |
IC BATT CHG CONTROLLER
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
|