Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
---|---|---|---|---|---|---|---|
NCP300LSN32T1
| Onsemi |
IC SUPERVISOR PWR SUP SUPPORT
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
2SK303-3-TB-E
| Onsemi |
NCH J-FET
| Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
LA6581CL-TL-E
| Onsemi |
SINGLE PHASE MOTOR DRIVER
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
SN74LS153MR1
| Onsemi |
MULTIPLEXER, LS SERIES TTL
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
SCV303LSN36T1G
| Onsemi |
IC SUPERVISOR VOLT DETECT
| Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
XCY99008BR2
| Onsemi |
PWM CURRENT-MODE CONTROLLER
| Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
74F27PC
| Onsemi |
IC GATE NOR 3CH 3-INP 14DIP
| Lead Time: 9-12Days | -- -- | 800 | Total:
$
| |
NCP301HSN18TIG
| Onsemi |
IC SUPERVISOR ANA UNDERVOLT DET
| Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
SPT5230SCT
| Onsemi |
IC DAC 10BIT A-OUT 52QFP
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
SM3Z1005T1G
| Onsemi |
DIODE ZENER 0.2W SPCL SOD323
| Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
SN54LS112AJ
| Onsemi |
J-K FLIP-FLOP
| Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
XC431622CFU8R2
| Onsemi |
16BIT MCU W/FLASH912B32
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
MC74VHC04DT
| Onsemi |
IC INVERTER
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
SMA4206-TL-E
| Onsemi |
OSC IC FOR LASER DIODE
| Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
SCH1419-TL-E
| Onsemi |
NCH 2.5V DRIVE SERIES
| Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
MC74VHC138M
| Onsemi |
DECODER/DRIVER, AHC/VHC SERIES
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
MC929F
| Onsemi |
IC GATE NOR
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
SN74LS125AM
| Onsemi |
IC BUFF NON-INVERT 5.25V 14SOIC
| Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
HUF76121D3ST
| Onsemi |
N-CHANNEL POWER MOSFET
| Lead Time: 9-12Days | -- -- | 9000 | Total:
$
| |
NTD5N50
| Onsemi |
N-CHANNEL POWER MOSFET
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
|